Close Go back Collapse all sections
Process Data set: 1km track assembly procedure in the Cáceres - Mérida High-Speed Line (en) en

Key Data Set Information
Location GLO
Reference year 2020
Name
1km track assembly procedure in the Cáceres - Mérida High-Speed Line
Synonyms S-P-01849
Classification
Class name : Hierarchy level
  • The International EPD System: Construction products / Steel and other metal products
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Time representativeness
Data set valid until 2025
Time representativeness description Registration date: 2020-02-04 Validity date: 2025-02-03
Technological representativeness

Indicators of life cycle

IndicatorDirectionUnit Production
A1-A3
Transport
A4
Installation
A5
Output
  • ND
  • ND
  • ND
Output
  • ND
  • ND
  • ND
Output
  • ND
  • ND
  • ND
Output
  • 23
  • 0.37
  • 8.97
Output
  • ND
  • ND
  • ND
Output
  • ND
  • ND
  • ND
Input
  • 0
  • 0
  • 36.5
Output
  • 5.058E+4
  • 6.117E+4
  • 1.374E+4
Input
  • 4.097E+6
  • 3.535E+5
  • 1.257E+5
Input
  • 2.096E+5
  • 0
  • 1.774E+5
Input
  • 0
  • 0
  • 0
Output
  • 12.4
  • 5.3
  • 1.93
Input
  • 896
  • 1.203E+4
  • 6178
Input
  • 2.675E+5
  • 4.351E+5
  • 529
Input
  • 0
  • 0
  • 0
Input
  • 3.115E+4
  • 0
  • 0
Input
  • 4.306E+6
  • 7.886E+5
  • 3.03E+5
Input
  • 2.684E+5
  • 1.203E+4
  • 6707

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
  • 3.84E+6
  • 7.621E+5
  • 2.947E+5
  • 9.87
  • 0.091
  • 0.035
  • 1545
  • 159
  • 117
  • 0.024
  • 0.009
  • 0.003
  • 7.8E+2
  • 34.8
  • 29.1
  • 191
  • 7.66
  • 4.19
  • 3.39E+5
  • 4.608E+4
  • 1.934E+4